Commentaire
The current Ontario 2015 Clause 3.1.9.4 (5) allows the ability to waive the 50Pa requirement when a building is sprinklered (except as required by Sentence (7)). This has been the case in Ontario for several code cycles and has never been an issue of concern. This provision is not included in the proposed update and should be retained.
Soumis le 10 mars 2022 10:13 AM
Commentaire sur
Modifications proposées pour la prochaine édition du Code du bâtiment de l’Ontario (consultation hivernale)
Numéro du REO
019-4974
Identifiant (ID) du commentaire
59987
Commentaire fait au nom
Statut du commentaire