Cette consultation a eu lieu :
du 20 janvier 2026
au 6 mars 2026
Résumé de la décision
An amended Environmental Compliance Approval with Limited Operational Flexibility (air & noise) has been issued to Ecovyst Calabrian Corporation Canada Inc., a Sulphur Dioxide manufacturing facility located in Timmins, Ontario.
Détails de l'emplacement
Adresse du site
375 Hallnor Road
Porcupine ,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
INEOS Calabrian Corporation Canada, Inc.
375 Hallnor Road
Porcupine,
ON
P0N 1C0
Canada
Détails de la décision
An amended Environmental Compliance Approval with Limited Operational Flexibility (air & noise) has been issued to Ecovyst Calabrian Corporation Canada Inc., a Sulphur Dioxide manufacturing facility located in Timmins, Ontario.
The Approval allows for the operation of:
- air separation
- SO2 clean system
- sulphur dioxide absorber systems
- combustion equipment (process and non-process)
- stand-by power system; and
- cooling towers
Emissions to the air from this facility include:
- sulphur dioxide
- nitrogen oxides; and
- carbon monoxide
The Environmental Compliance Approval with Limited Operational Flexibility (air & noise), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air & noise).
The Limited Operational Flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
How to Appeal
Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 28 octobre 2026 pour entamer le processus d’appel.
Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.
Comment interjeter appelClick to Expand Accordion
Start the process to appeal
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
INEOS Calabrian Corporation Canada, Inc.
375 Hallnor Road
Porcupine,
ON
P0N 1C0
Canada
Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Inclure les éléments suivants:
Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.
Communiquer avec nous
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Proposition initiale
Détails de la proposition
This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 8970-A8SK6T for INEOS Calabrian Corporation Canada Inc., a sulphur dioxide production plant which is condensed to the liquid state for storage and shipment located in Porcupine, Ontario.
The emission sources from the manufacturing and associated processes that discharge to the air include sulphur dioxide absorbers, cooling tower, natural gas fired boilers, natural gas fired comfort heating system and diesel fired emergency generator.
The amendment includes addition of air separation unit and a cooling tower.
Emissions to the air from this facility include:
- sulphur dioxide
- nitrogen oxides, and
- carbon monoxide
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The Limited Operational Flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 20 janvier 2026
au 6 mars 2026
Communiquer avec nous
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0