Cette consultation a eu lieu :
du 19 août 2026
au 18 septembre 2026
Résumé de la proposition
This proposal is for a renewal to Permit to Take Water No. 7451-AJ5LLF for ST. MARYS CEMENT INC. (CANADA). Water will be taken from two wells for manufacturing purposes in Middlesex Centre, Ontario.
Détails de l'emplacement
Adresse du site
Lot 3, Concession 5
Middlesex Centre,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
ST. MARYS CEMENT INC. (CANADA)
55 Industrial Street
Toronto,
ON
M4G3W9
Canada
Détails de la proposition
This proposal is for a renewal to Permit to Take Water No. 7451-AJ5LLF for ST. MARYS CEMENT INC. (CANADA). Water will be taken from two wells for manufacturing purposes in Middlesex Centre, Ontario. Details of the water taking are as follows:
Permit type – Renewal
Source of Water: READY MIX PLANT WELL1
- Purpose of water taking: manufacturing - Incorporating water into a product
- Maximum rate per minute (litres): 909
- Maximum number of hours of taking per day: 24
- Maximum volume per day (litres): 1,309,248
- Maximum number of days of taking per year: 310
- Earliest calendar date of taking (mm/dd): 01/01
- Latest calendar date of taking (mm/dd): 12/31
- Period of taking: 10 years
Source of Water: READY MIX PLANT WELL 2
- Purpose of water taking: manufacturing - Incorporating water into a product
- Maximum rate per minute (litres): 52
- Maximum number of hours of taking per day: 24
- Maximum volume per day (litres): 75,000
- Maximum number of days of taking per year: 310
- Earliest calendar date of taking (mm/dd): 01/01
- Latest calendar date of taking (mm/dd): 12/31
- Period of taking: 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 1 permit.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 19 août 2026
au 18 septembre 2026