Cette consultation a eu lieu :
du 20 août 2026
au 19 septembre 2026
Résumé de la proposition
This proposal is for a renewal to Permit to Take Water No. 0781-C79PZW for RIVER VALLEY DEVELOPMENTS INC. Water will be taken from one pond for aggregate extraction, and spraying in Guelph, Ontario.
Détails de l'emplacement
Adresse du site
Lot 2, Concession 5
Guelph,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
RIVER VALLEY DEVELOPMENTS INC.
195 Hanlon Creek Boulevard
Guelph,
ON
N1C0A1
Canada
Détails de la proposition
This proposal is for a renewal to Permit to Take Water No. 0781-C79PZW for RIVER VALLEY DEVELOPMENTS INC. Water will be taken from one pond for aggregate extraction, and spraying in Guelph, Ontario. Details of the water taking are as follows:
Permit type - Renewal
Source Name: Dolime Quarry - Sump 5
- Purpose: aggregate extraction, dewatering
- Maximum rate per minute (litres): 9,550
- Maximum number of hours of taking per day: 24
- Maximum volume per day (litres): 13,750,000
- Maximum number of days of taking per year: 365
- Earliest calendar date of taking (mm/dd): 01/01
- Latest calendar date of taking (mm/dd): 12/31
- Period of taking: 10 years
Source Name: Aggregate Washplant
- Purpose: aggregate extraction, spraying
- Maximum rate per minute (litres): 4,550
- Maximum number of hours of taking per day: 12
- Maximum volume per day (litres): 3,276,000
- Maximum number of days of taking per year: 244
- Earliest calendar date of taking (mm/dd): 01/01
- Latest calendar date of taking (mm/dd): 12/31
- Period of taking: 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 3 permit.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 20 août 2026
au 19 septembre 2026