Hydro One Networks Inc. - Environmental Compliance Approval (sewage)

Instrument type: Environmental Compliance Approval (sewage)

ERO number
019-8932
Ministry reference number
1000297644
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Decision
Decision posted
Comment period
July 16, 2024 - August 30, 2024 (45 days) Closed
Last updated

This consultation was open from:
July 16, 2024
to August 30, 2024

Decision summary

Hydro One Networks Inc. requested to withdraw their application for an Environmental Compliance Approval. The application is considered withdrawn, and no approval was issued.

Location details

Site address

470 Glendale Avenue
Glendale Transmission Station
St. Catharines, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Hydro One Networks Inc.
483 Bay Street
Floor TCT12
Toronto, ON
M5G 2P5
Canada

Decision details

Hydro One Networks Inc. requested to withdraw their application for an Environmental Compliance Approval. The application is considered withdrawn, and no approval was issued.

On March 11, 2026, Hydro One Networks Inc. requested to withdraw their application for an Environmental Compliance Approval.

The application is considered withdrawn, and no approval was issued. The ministry closed the file on March 18, 2026.

Comments received

Through the registry

0

By email

0

By mail

0
View comments submitted through the registry

Effects of consultation

No comments were received.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

How to Appeal

Appeals are not allowed

The ministry made no decision that could be appealed

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice

Original proposal

ERO number
019-8932
Ministry reference number
1000297644
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Proposal posted

Comment period

July 16, 2024 - August 30, 2024 (45 days)

Proposal details

The proposal is for a new Environmental Compliance Approval for stormwater management works serving Hydro One Networks Inc., located at 470 Glendale Avenue, in the City of St. Catharines.

The stormwater management works comprise of Stormwater Quality Control, Quantity Control, and Erosion Control works, and include removal of three of the four existing transformers, installation of one new transformer and associated spill containment in a new location within the station and a new oil water separator (OWS). The existing transformer spill containment pit will be upgraded and connected to the OWS.

All site storm drainage collected will be discharged to a municipal storm sewer, which discharges to the Welland Canal-Niagara River, and eventually Lake Ontario.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Commenting is now closed.

This consultation was open from July 16, 2024
to August 30, 2024

Connect with us

Contact