This notice is for informational purposes only. There is no requirement to consult on this initiative on the Environmental Registry of Ontario. Learn more about the types of notices on the registry.
Why consultation isn't required
The purpose of the posting is to inform the general public of the amendment and their right to require a hearing in respect of this decision.
We consider that the potential effect of the amendment on the environment to be insignificant.
Bulletin details
The Renewable Energy Approval for the Brockville Solar Project has been amended. This is a technical change to allow the construction of shallow detention basins and berms to address historical flooding concerns downstream of the site.
The ministry has also removed spent conditions from the approval that are no longer applicable or updated them as appropriate.
The ministry has reviewed the Stormwater Management report completed for the amendment.
No new environmental effects are expected beyond those that were previously identified, documented and consulted on through the Renewable Energy Approval process.
This Class 3 solar facility is located along County Road 27 / Centennial Road at parts 1-4, Reference Plan 28R-7817, Lot 19, Concession 2, in the Township of Elizabethtown-Kitley, United Counties of Leeds and Grenville.
Third-party hearing provisions
Any resident of Ontario may require a hearing by the Ontario Land Tribunal (OLT) within 15 days after the date this decision is loaded to the Environmental Registry by written notice served upon all of the following:
Appellate body
Courier mail should be addressed to:
Ontario Land Tribunal
25 Grosvenor Street, 4th Floor
Toronto, Ontario, M7A 1R1
Mail sent through Canada Post should be addressed to:
Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario M5G 1E5
Phone: 416-212-6349
Toll free: 1-866-448-2248
TTY: 1-800-855-1155
Email: OLT.Registrar@ontario.ca
Issuing authority
Sherif Hegazy, P.Eng.
Director, Section 47.5, Environmental Protection Act
Environmental Permissions Branch
135 St. Clair Avenue West
Floor 1
Toronto, Ontario
M4V 1P5
Phone: (437) 216-7610
Toll-Free Phone: (800) 461-6290
Email: enviropermissions@ontario.ca
Proponent
Brockville Solar Inc.
105 Commerce Valley Dr W, Suite 410
Markham, Ontario
L3T 7W3
Email: denny.richard@engie.com
An applicant for a hearing shall state in the notice requiring the hearing:
- A description of how engaging in the renewable energy project in accordance with the renewable energy approval will cause either:
- serious harm to human health
- serious and irreversible harm to plant life, animal life or the natural environment
- The portion of the renewable energy approval in respect of which the hearing is required
- The relief sought.
Further information is provided on the OLT’s website at: https://olt.gov.on.ca/
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Mark Badali
135 St. Clair Ave W
4th Floor
Toronto,
ON
M4V 1P5
Canada