February 26, 2020 - April 11, 2020 (45 days) Closed
Last updated
A new Environmental Compliance Approval was granted to Sunrise Freight Systems Inc. or the construction of stormwater management facilities at 50 Sloan Drive, Town of Caledon, Ontario.
September 18, 2019 - November 2, 2019 (45 days) Closed
Last updated
An Environmental Compliance Approval has been issued for storm sewers serving KRS Holdings Wingham Inc., located at 82 Kerr Drive, in the Town of Wingham.
February 20, 2020 - April 5, 2020 (45 days) Closed
Last updated
We have cancelled the Environmental Compliance Approval (Industrial Sewage) application for Polycorp Ltd., a rubber products manufacturing facility, located at 33 York Street West in Elora (Centre Wellington), Ontario.
Instrument type:
Approval of a program to prevent, reduce or control discharge
ERO number
019-0978
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
December 3, 2019 - January 17, 2020 (45 days) Closed
Last updated
The Program Approval was issued to Nortel Networks International Corporation to prevent or to reduce and control the discharge into the natural environment of any contaminant from the source of the contaminant of a site in London, Ontario.
October 28, 2019 - December 12, 2019 (45 days) Closed
Last updated
We have amended the Pesticides Regulation under the Pesticides Act to reduce complexity and modernize pesticide management in Ontario while ensuring strong protection for human health and the environment.
September 25, 2019 - November 9, 2019 (45 days) Closed
Last updated
An Environmental Compliance Approval has been granted for 2030470 Ontario Limited for stormwater management works to serve the Rosedale Cross Dock facility located at 9460 Mitch Owens Road in Ottawa.
We have approved a new Environmental Compliance Approval for Orillia Power Distribution Corporation to install a new secondary oil containment system, as part of a proposed electrical utility distribution substation, located at 4600 Uhthoff Line, in the City of Orillia.
A new Environmental Compliance Approval (ECA) No. 7934-BHGQP4 was issued on March 31, 2020 to John Zubick Limited for a waste transfer and processing site, located in London, Ontario, for end-of-life vehicles, recyclables and a public drop-off facility.
November 25, 2019 - January 9, 2020 (45 days) Closed
Last updated
An Environmental Compliance Approval (air) was issued to Reynolds Consumer Products Canada Inc./Produits de Conssommation Reynolds Canada Inc. for all emission sources from the facility that exhaust to the atmosphere.
Instrument type:
Approval for variance from the Liquid Fuels Handling Code
ERO number
019-1650
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
April 14, 2020 - May 14, 2020 (30 days) Closed
Last updated
Original Traders Energy (OTE), a supplier and distributer petroleum products, is building a new facility at 180 Industrial Park Drive, Shannonville, Ontario, K0K 3A0. The company wants to *manifold the *Stage I vapour recovery header on the loading skid for the underground storage tanks at this site.
The Director of Exploration has made a decision to issue the exploration permit application PR-20-000063 to John Brady for early exploration activities near Sudbury, Ontario.
February 11, 2020 - March 27, 2020 (45 days) Closed
Last updated
An amended Environmental Compliance Approval No. A280229 was issued on April 03, 2020 for GFL Environmental, a waste transfer site located at 100 Unwin Avenue and 200 Unwin Avenue, in the City of Toronto, Ontario.
September 6, 2019 - October 21, 2019 (45 days) Closed
Last updated
An Environmental Compliance Approval with Limited Operational Flexibility (Air), which replaces all the current Environmental Compliance Approvals for Air, has been granted for Royal Adhesives & Sealants Canada Ltd., located in Toronto, Ontario.
September 11, 2019 - October 25, 2019 (45 days) Closed
Last updated
An Environmental Compliance Approval with Limited Operational Flexibility (Air) has been issued to BridgePort Windsor Marine Terminal Inc., former name: 1544929 Ontario Limited.
An Environmental Compliance Approval with Limited Operational Flexibility (Air) has been granted to Agnico Eagle Mines Limited for the advanced mine exploration program on the Upper Beaver property located approximately 5 kilometres northeast of Dobie, Ontario.
October 4, 2019 - November 18, 2019 (45 days) Closed
Last updated
An Environmental Compliance Approval was issued for Coland Developments Corporation for stormwater management works to serve an office/commercial development located in the Town of Midland, Ontario.
A new Environmental Compliance Approval (Industrial Sewage) No. 8827-BMLK8D was issued for the establishment of stormwater management works to service one (1) large warehouse located at 24 Clearview Drive in Tillsonburg, Ontario.
Instrument type:
Approval for variance from the Liquid Fuels Handling Code
ERO number
019-1624
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
April 8, 2020 - May 8, 2020 (30 days) Closed
Last updated
2538459 ONTARIO INC wants to keep the VersapipeTM 4710 piping (a high-density polyethylene pipe commonly used by the natural gas industry) in place at its facility. The pipe was installed as vent piping for underground tanks and would be very expensive to dig up and replace.