Greenfield Global Inc. & Chatham-Kent Public Utilities Commission - Environmental Compliance Approval (waste)

Instrument type: Environmental Compliance Approval (waste)

ERO number
026-0437
Ministry reference number
1692-DS4NFU
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Decision Updated
Decision posted
Comment period
June 29, 2026 - July 29, 2026 (30 days) Closed
Last updated

Update Announcement

This notice has been updated on June 29th 2026, to reflect the information on the application ECA: The clarification of the hours of operation and the type of waste disposal site. The comment period is re-open for a 30 days .

This consultation was open from:
June 29, 2026
to July 29, 2026

Decision summary

The ministry has issued a new Environmental Compliance Approval No. 8158-DUPHHB for an anaerobic digestion processing facility located at 175 Bloomfield Road, Chatham-Kent, Ontario.

Location details

Site address

175 Bloomfield Road
Chatham-Kent, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Greenfield Global Inc. & Chatham-Kent Public Utilities Commission
275 Bloomfield Road
Chatham-Kent, ON
N7M 0N6
Canada

Decision details

This Environmental Compliance Approval (ECA) authorizes the anaerobic digestion processing facility to receive and process a maximum of 900,000 tonnes of organic waste per year to produce renewable natural gas (RNG).

The organic waste is limited to the following wastes from Ontario: 

  • Sewage sludge from Chatham-Kent Public Utilities Commission (PUC)
  • Biodegradable and Clean organics from Industrial, Commercial, and Institutional sources
  • Thin stillage from the Greenfield Ethanol Plant; and
  • Wastewater from the Greenfield Ethanol Plant

The facility will operate 24-hours per day, seven days a week, year-round. The majority of the waste will be received by pipeline from the Chatham-Kent PUC and Greenfield Ethanol Plant. Waste material received by trucks will be limited to the hours of 8:00 a.m. to 7:00 p.m. seven days a week, year-round. An average of 12 trucks per day will deliver and transfer the waste to and from the site.

The anaerobic process will create wastewater, digestate, residual waste (sand, silt, grit) and RNG.

  • Wastewater will be treated and discharged into the Chatham-Kent’s municipal sanitary sewer where it will be further treated through the Chatham-Kent’s municipal wastewater treatment plant
  • Digestate will be transferred to a site(s) that is approved to accept it as either a waste or a non-agricultural source material (NASM) through an ECA or NASM Plan
  • Residual waste will be sent for disposal at a site for which an ECA has been issued by the Ministry
  • RNG will be transferred into the natural gas pipeline

Conditions within the ECA are imposed for the safe receipt, processing and handling, and transfer of organic wastes at the site. Further conditions include site inspections, maintenance, nuisance control, complaint procedure, training, emergency plans, and annual reporting, which will ensure the protection of the environment and human health.

Associated ECAs are 6839-DU3JAW (sewage) and 7683-DWWJVT (air).

Comments received

Through the registry

104

By email

2

By mail

0
View comments submitted through the registry

Effects of consultation

The proposal notice was posted on April 20, 2026 for a 45 day comment period until June 4, 2026. On June 29, 2026, the proposal notice was updated to clarify the hours of operation and the type of waste disposal site, and the comment period was extended for 30 days until July 29, 2026. The Ministry received 104 comments online and 2 comments in writing. We have considered all in-scope comments on the proposal.

The in-scope comments are addressed as follows:

Odours:Waste processing and storage will be conducted indoors or within sealed tanks to minimize odour. The facility will be equipped with an odour management/treatment system that was evaluated and incorporated within conditions of the Air Emissions ECA.

The Waste ECA contains conditions to ensure that odours do not negatively impact the environment during the transportation, receiving and processing of the waste.

Air quality and noise: Impacts to the air quality and noise from activities at the site were evaluated and incorporated within conditions of the Air Emissions ECA.

The Waste ECA contains a condition that the site will be constructed, operated and maintained in a manner that noise and dust do not negatively impact the environment.

Increased presence of insects, rodents, and scavenging birds: The facility is designed to meet good industrial practices, and the facility will operate to mitigate pests.

The Waste ECA contains conditions that the facility shall implement necessary housekeeping procedures to eliminate sources of attraction and if necessary, hire a qualified, licensed pest control professional to design and implement a pest control plan for the Site.

Truck traffic and impacts on roads: It is anticipated that approximately six (6) trucks per day will exit the site transporting dewatered digestate, and approximately two (2) trucks per month will exit the site transporting grit for final disposal. No additional environmental studies were required due to the limited traffic volume.

The Waste ECA contains conditions to ensure that the transportation of waste to and from the site are conducted to prevent impacts to the environmental. No queuing or parking of vehicles are allowed on any roadway that is not a distinct part of the site.

Composition and source of waste: Processed waste will come from Chatham-Kent Public Utilities Commission sludge by truck and pipeline; biodegradable and clean organics from Industrial, Commercial, and Institutional sources by truck; and thin stillage and wastewater both from the Greenfield Ethanol Plant by pipeline.

Impacts on Aboriginal and treaty rights: The ministry recognizes and takes seriously its duty to consult Indigenous peoples where it is contemplating decisions or actions that may adversely impact constitutionally protected Aboriginal or treaty rights.

As part of the review of the application, the ministry considered local site conditions. ECAs are issued where local site conditions are considered suitable and the ministry’s requirements are met. The ECA sets out terms and conditions on how operations at the site must take place to ensure the activities meet the ministry standards that are in place to protect human health and the environment.

Water quality and impacts on the Thames River: There will be no additional discharge or input to Thames River resulting from the waste processing at this facility. The wastewater that will be treated by the facility will be discharged directly to the municipal sanitary sewer. This discharge will meet the municipality’s sewer by-law and will be further treated by the municipal wastewater treatment plant under the authority of their wastewater treatment ECA.

Stormwater management was evaluated and incorporated within conditions of the Wastewater ECA.

The facility is equipped with secondary containment systems to address any spills that may occur from the waste that processed and stored in tanks located outside. The design of this secondary containment systems was evaluated and incorporated within conditions of both the Waste and Wastewater ECAs to ensure the safety of the natural environment.

Digestate testing, monitoring, classification, and management: The dewatered digestate produced by the facility will be further processed by another licensed facility, applied to non-agricultural land under the authorization of a separate ECA, sent for final disposal at a licensed facility, or applied on agricultural land under the authorization of a Non-Agricultural Source Material (NASM) Plan. Conditions within the ECA require that the facility ensure that the digestate is sampled, tested and meets quality requirements of either the ECA or the NASM Plan of the receiving site.

Amount of waste at the facility and cumulative effects: The 900,000 metric tonnes (MT) per year figure should not be interpreted as 900,000 MT/year of new external organic waste. A substantial portion of the permitted quantity represents existing Greenfield’s and Chatham-Kent Public Utility Commission’s process wastewater and other material streams already generated and managed at their respective site.

This project is intended to improve the treatment and environmental management of these existing streams through enclosed processing, anaerobic digestion, wastewater treatment, secondary containment, stormwater controls and renewable energy recovery. Potential impacts to groundwater, surface water, stormwater and other environmental receptors have been addressed through the respective ECA applications and supporting technical studies submitted to MECP.

Monitoring, reporting and inspection: Conditions within the Waste ECA requires the performance of routine inspections of the facility to ensure that the facility is operating as required by the ECA. The facility shall monitor and keep records of the waste activities that occur at the Site; such as all waste quality and quantity that is received and sent from the site, as well as any environmental and operational problems occurred at the site and how these were resolved. A summary of the facility’s operation shall be provided to the Ministry on an annual basis.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

40 St. Clair Avenue West
Floor 2
Toronto, ON
M4V 1M2
Canada

Office phone number

How to Appeal

This instrument decision can be appealed. You have 15 days from October 13, 2026 to begin the appeal process.

Carefully review the information below to learn more about the appeal process.

How to appealClick to Expand Accordion

Start the process to appeal

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Issuing authority
Neryed Ragbar
Manager (A) Priority Project Approvals

Environmental Permissions Branch
135 St Clair Avenue West
Floor 3
Toronto, ON
M4V 1P5
Canada

437-776-8348

Proponent(s)

Greenfield Global Inc. & Chatham-Kent Public Utilities Commission
275 Bloomfield Road
Chatham-Kent, ON
N7M 0N6
Canada


Appellate body

Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Ontario Land Tribunal


Include the following:

ERO number
026-0437
Ministry reference number
1692-DS4NFU

This is not legal advice. Please refer to the Environmental Bill of Rights for exact legal requirements. Consult a lawyer if you need help with the appeal process.

Connect with us

Contact

Share

Email

Facebook

X

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice

Original proposal

ERO number
026-0437
Ministry reference number
1692-DS4NFU
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Proposal posted

Comment period

June 29, 2026 - July 29, 2026 (30 days)

Proposal details

This proposal is for an Environmental Compliance Approval (waste disposal site) for an anaerobic digestion processing facility. This processing facility is a 5.4 hectare property located in the Municipality of Chatham-Kent.

The facility will use organic materials from a variety of sources within Ontario to produce renewable natural gas (RNG).

The facility will receive and process an average of 2,266 metric tonnes of incoming non-hazardous waste per day where the maximum quantity of waste delivered to the site on any given day is 2,500 metric tonnes. The facility will be designed to receive and process an average of 802,464 metric tonnes, up to a maximum of 900,000 tonnes of waste per year..  The facility will operate 24-hours per day, seven days a week, year-round.  Waste material received by trucks will be limited to the hours of 8:00 a.m. to 7:00 p.m. seven days a week, year-round.

This application was submitted in conjunction with application Reference numbers 8557-DS4P2L (sewage) and 1859-DS4P8C (air).

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

40 St. Clair Avenue West
Floor 2
Toronto, ON
M4V 1M2
Canada

Office phone number

Comment

Commenting is now closed.

This consultation was open from June 29, 2026
to July 29, 2026

Connect with us

Contact