This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 7521-9W3KV3 for Catalent Ontario Limited, a soft gel capsules manufacturing facility located in the Township of Strathroy, Ontario.
This proposal is for an amendment to the Environmental Compliance Approval no. 4471-ABUQXZ to upgrade non-municipal subsurface disposal works servicing the seasonally operated Bigwin Island Golf Club, located at 1137 Old Highway 117 in Baysville, Township of Muskoka, Ontario.
This proposal is for a new Environmental Compliance Approval (air) for Northwind Transport Ltd., a trucking and freight facility, located in Timmins, Ontario.
This proposal is for a new Permit to Take Water for R. W. TOMLINSON LIMITED. Water will be taken from one pond for aggregate washing, aggregate extraction, and construction, located in Codrington, Ontario.
February 17, 2026 - April 3, 2026 (45 days) Closed
Last updated
Tok Tires Limited requested to withdraw their application for an Environmental Compliance Approval (air). The application is considered withdrawn and no approval was issued.
Instrument type:
New - Approval of a plan of subdivision in an area where there is no official plan in place
ERO number
019-9243
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
November 21, 2024 - December 21, 2024 (30 days) Closed
Last updated
Application 60-T-247539 to create twelve (12) lots, and three (3) blocks on Wabigoon Lake was approved on May 8, 2026, subject to conditions. The last date to appeal the decision under the Planning Act is May 28, 2026.
The ministry has accepted a risk assessment prepared for the owner as part of their future development plans for a property at 1 Hayward Street, Port Hope. The director is considering issuing a Certificate of Property Use.
We issued an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) to Cyclone Manufacturing Incorporated, an aerospace product and parts manufacturing facility, located in the City of Mississauga, Ontario.
October 10, 2024 - November 24, 2024 (45 days) Closed
Last updated
Approval has been granted to amend the Environmental Compliance Approval (air & noise) No. 8603-C4PFUP for Canadian Builders Hardware Manufacturing Inc., a facility that manufactures various architectural metal fittings, located at 71 Sheffield Street in North York, Ontario.
This proposal is for a Permit to Take Water for Real Property Operations (Ontario) - Detachment Petawawa. Water will be taken from Allumette Lake for manufacturing - building operation purposes in Renfrew, Ontario.
This proposal is for a renewal to Permit to Take Water No. 4231-A8BNM7 for ALAMOS GOLD INC. Water will be taken from one lake for industrial purposes in Dubreuilville, Ontario.
September 19, 2025 - November 3, 2025 (45 days) Closed
Last updated
An Environmental Compliance Approval with Limited Operational Flexibility (air & noise) which replaces all the current Environmental Compliance Approvals for Air has been granted to Magna Seating Inc., a facility manufacturing automotive seating components, located in the Town of Newmarket, Ontario.
This proposal is for an amendment to the Limited Operational Flexibility for the Environmental Compliance Approval (air & noise) No. A-500-4243319369 for 2419787 Ontario Inc., operating a hydrovac soil processing facility, located in the community of Carp in the City of Ottawa, Ontario.
Instrument type:
Approval to amend a municipality’s official plan
ERO number
026-0154
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
March 23, 2026 - April 22, 2026 (30 days) Closed
Last updated
A decision was made on May 5, 2026 to approve, in part, as modified, the withheld matters of Norfolk County Official Plan Amendment 163, as adopted by By-law 2024-48. Official Plan Amendment 163 updates policies and land use designations to comply with the Planning Act and to be consistent with the Provincial Planning Statement.
December 5, 2025 - January 19, 2026 (45 days) Closed
Last updated
We have approved updates to the Natural Heritage Assessment Guide (the Guide) for renewable energy projects. The updated Guide will ensure the ministry’s Natural Heritage Assessment process for renewable energy projects aligns with the regulatory amendments that were proposed to O. Reg. 359/09 (Renewable Energy Approvals Regulation).