August 18, 2023 - October 2, 2023 (45 days) Closed
Last updated
The application was cancelled by the Ministry because there was insufficient information in the application. An Environmental Compliance Approval was not issued.
August 10, 2026 - September 24, 2026 (45 days) Open
Last updated
This proposal is for an amendment to Environmental Compliance Approval (air & noise) No. 5917-BUTV5Q for Clean Harbors Canada, Inc., for the operation of a mobile treatment system, operating throughout the Province of Ontario.
Instrument type:
New - Approval for a consent (subject to conditions) in an area where there is no official plan in place
ERO number
026-0742
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
August 10, 2026 - September 9, 2026 (30 days) Closed
Last updated
The Ministry of Municipal Affairs and Housing (MMAH) has received an application for consent for a new lot in the unincorporated Township of Wabigoon, in the District of Kenora.
This proposal is to amend the Environmental Compliance Approval (air & noise) No. 2542-APGUC5 for Pastway Planing Ltd. for the operation of a lumber dimensioning and treatment facility, located in the Combermere, Ontario.
This proposal is to amend the Environmental Compliance Approval (air & noise) No. 8480-B2ZFQ3 for Fleet Canada Inc., a facility that manufactures fabricated aluminium and composite aircraft components, located in the Town of Fort Erie, Ontario.
This proposal is for a new Environmental Compliance Approval (industrial sewage) for Walker Aggregates Inc.. This application is for the collection, transmission, treatment and disposal of washwater from an aggregate washing plant and stormwater run-off.
This proposal is for a new Environmental Compliance Approval for the establishment of stormwater management facilities owned by G. Tackaberry & Sons Construction Company Limited for the collection, transmission, treatment and disposal of stormwater run-off from a site located at 3893 Highway 15, Joyceville, City of Kingston, Ontario.
This proposal is for a new Environmental Compliance Approval (industrial sewage) for Walker Aggregates Inc., located at 381769 Concession 4, in the Town of Hanover, Ontario.
The proposal is for a new Environmental Compliance Approval for the existing stormwater and groundwater management works serving Loyalist Quarry, located at 6595 County Road 2, in Odessa, Ontario.
August 7, 2026 - September 21, 2026 (45 days) Closed
Last updated
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) from Aevitas Inc., a waste processing facility, located in Ayr, Township of North Dumfries, Ontario.
The Director of Exploration has made a decision on the exploration permit application PR-26-000076 to Storm Exploration Inc. for early exploration activities.
The decision is to: issue the mineral exploration permit.
August 7, 2026 - September 21, 2026 (45 days) Closed
Last updated
This proposal is for an amendment to the existing Environmental Compliance Approval No. 4-099-69-947 to remove surface water discharge to the Big East River, update the monitoring requirements, and update the description of work to more accurately reflect current operations at the 570 Ravenscliff Road site, in the Town of Huntsville, Ontario.
August 7, 2026 - September 21, 2026 (45 days) Closed
Last updated
This proposal is for a new Environmental Compliance Approval (air & noise) for Tempel Canada Company, a manufacturer of transformer cores at a facility located at 4741 Palladium Way, Burlington, Ontario.
August 7, 2026 - September 21, 2026 (45 days) Closed
Last updated
This proposal is to amend the Environmental Compliance Approval (air & noise) No. 5362-5LET57 for Wenzel International, Inc. operating as Croven Crystals, a crystals manufacturing facility located in the Town of Whitby, Ontario.
August 7, 2026 - September 21, 2026 (45 days) Closed
Last updated
This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 5888-BVFRBU for Kap Paper Inc., a thermo-mechanical pulping (TMP) newsprint mill located in the Town of Kapuskasing, Ontario.
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) from Washington Mills Electro Minerals Corporation, a production facility for standard abrasive grain and specialty electro-fused minerals, located in Niagara Falls, Ontario.
October 6, 2025 - November 20, 2025 (45 days) Closed
Last updated
This proposal was for an amendment of Environmental Compliance Approval (ECA) No. A680301 for GFL Environmental Services Inc. for the operation of an ex-situ biological treatment facility for non-hazardous petroleum hydrocarbon and volatile organic compound impacted soils.
February 27, 2026 - March 29, 2026 (30 days) Closed
Last updated
Permit to Take Water No. P-300-7412971813 was issued to Kimberly-Clark Inc. to renew Permit to Take Water No.1434-BKSSXN for manufacturing purposes. Water will be taken from three sources (1 river and 2 wells) located in Huntsville, Ontario for 10 years.