December 27, 2024 - February 10, 2025 (45 days) Closed
Last updated
A new Environmental Compliance Approval was issued to First Ardelt Holdings Limited, for approval of the establishment of stormwater management works to service a catchment area of approximately 2.7 hectares, discharging to the existing 825 millimetres diameter storm sewer located along Ardelt Place and ultimately to Schneider Creek.
January 9, 2025 - February 23, 2025 (45 days) Closed
Last updated
An amended Environmental Compliance Approval was issued to C.H. Demill Holdings Inc. for approval of existing works for dewatering of the extraction areas of the Long’s Quarry and the immediately adjacent to east Melrose Quarry located in proximity of the southern Long's Quarry site boundary.
August 16, 2024 - September 30, 2024 (45 days) Closed
Last updated
A new Environmental Compliance Approval was issued to Tristone Aggregates Inc. for approval of upgrades to the existing works for the collection, transmission, treatment and reuse of wash water from aggregate washing operations located within the existing Cartwright Pit located at 40581 Winthrop Road, Londesborough, Municipality of Central Huron.
September 9, 2024 - October 24, 2024 (45 days) Closed
Last updated
The ministry has amended existing Environmental Compliance Approval (ECA) No. 3-0386-78-006 to incorporate a change in the owner name, reflect current site use, and permit the establishment of additional stormwater management works to serve the Wessuc Inc. site at 1693 Colborne St. E. in Brantford, Ontario.
An amendment to the existing approval has been issued to TEVA Canada Limited. This approval is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 6186-A26P7S for TEVA Canada Limited (TEVA), a pharmaceutical manufacturing facility located in Whitfield-Stouffville, Ontario.
December 12, 2025 - January 11, 2026 (30 days) Closed
Last updated
The Director of Exploration has made a decision on the exploration permit application PR-25-000265 to Stirling Metals Corp. for early exploration activities.
The decision is to issue the mineral exploration permit.
November 26, 2025 - January 10, 2026 (45 days) Closed
Last updated
Approval is granted to amend the existing Environmental Compliance Approval (waste disposal site) No. A-500-1188155825 for a processing facility in the City of Welland, Ontario.
This proposal is to amend the Environmental Compliance Approval No. 3257-CRAPT7 for the stormwater management works serving the Vine Fresh Acres Ltd. Phase 3 Greenhouse Expansion Site, located at 420 Essex Road 14, and the existing Lebo Farms Ltd. greenhouse site located at 429 Mersea Road 8, both in the Municipality of Leamington.
The ministry has issued a new Environmental Compliance Approval (Sewage) to Enbridge Gas Inc. for modifications to existing stormwater management works servicing the Dawn Natural Gas Facility with associated buildings and structures, drive aisles, parking, and gravel areas located at 3332 Bentpath Line, Dawn-Euphemia Township, County of Lambton.
Instrument type:
Approval to amend a municipality’s official plan
ERO number
025-0557
Notice type
Instrument
Notice stage
DecisionUpdated
Decision posted
Proposal posted
Comment period
May 29, 2025 - July 13, 2025 (45 days) Closed
Last updated
A decision was made on December 19, 2025 to approve, with modifications, the Town of Milton Official Plan Amendment 92 (OPA 92), as adopted pursuant to sections 17 and 26 of the Planning Act, by By-law 039-2025. The approved OPA 92 updates Milton's Official Plan to guide the Town's growth until 2051.
January 30, 2026 - March 16, 2026 (45 days) Closed
Last updated
This proposal is for a new Environmental Compliance Approval for the establishment of subsurface sewage disposal works for a total of 41,900 liters per day, to service a campground located at 6 B12 Road, in the Township of Rideau Lakes.
January 30, 2026 - March 16, 2026 (45 days) Closed
Last updated
This proposal is for a new Environmental Compliance Approval (sewage) to replace multiple onsite sewage wastewater systems with one single sewage treatment system servicing a seasonal campground site located at 2674 Front Road, in the Town of Vittoria, Ontario.
January 30, 2026 - March 16, 2026 (45 days) Closed
Last updated
This proposal is to amend the Environmental Compliance Approval (air & noise) No. 8-6025-98-007 for Aevitas Inc., a facility that processes, stores and transfers PCB, hazardous & liquid industrial wastes, industrial metal wastes and non-hazardous solid materials, located in the Town of Kirkland Lake, Ontario.
January 30, 2026 - March 16, 2026 (45 days) Closed
Last updated
This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 3044-A2WMPJ for AOC Resins and Coatings Company, a facility that produces polyester resins, gelcoats, and associated resins, located in the City of Guelph, Ontario.