This consultation was open from:
February 4, 2026
to March 6, 2026
Decision summary
Permit to Take Water No. P-300-1741082845 was issued to Esbaugh Sand & Gravel Ltd. for the Hallman Pit in the Township of Wilmot. Water will be taken from one pond for aggregate washing and dust suppression purposes.
Location details
Site address
1922 Witmer Road
WILMOT,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
ESBAUGH SAND & GRAVEL LTD.
1922 Witmer Road
WILMOT,
ON
N0B 2H0
Canada
Decision details
Permit to Take Water No. P-300-1741082845 was issued to Esbaugh Sand & Gravel Ltd. for the Hallman Pit in the Township of Wilmot. Water will be taken from one pond for aggregate washing and dust suppression purposes. Details of the water taking are as follows:
Permit type: New
Source name: Wash Pond
Purpose: aggregate washing
- maximum rate per minute (litres): 7,600
- maximum number of hours of taking per day: 12
- maximum volume per day (litres): 5,472,000
- maximum number of days of taking per year: 230
- earliest calendar date of taking (mm/dd): March first
- latest calendar date of taking (mm/dd): December 31
- period of taking: until October 8, 2031
Purpose: aggregate washing - dust suppression
- maximum rate per minute (litres): 7,600
- maximum number of hours of taking per day: 12
- maximum volume per day (litres): 100,000
- maximum number of days of taking per year: 230
- earliest calendar date of taking (mm/dd): March first
- latest calendar date of taking (mm/dd): December 31
- period of taking: until October 8, 2031
The permit limits the combined taking for both purposes to 7,600 litres per minute and 5,472,000 litres per day.
Permits to Take Water include conditions that require the permit holder to:
- collect and record the daily amount of water taken
- comply with the terms and conditions in the permit
- immediately report complaints or interference to the ministry
- report water takings each year to the ministry
Issued Permits To Take Water can be viewed and downloaded at Access Ontario, by searching the approval number, P-300-1741082845, in the search field located at the top of the map, see "I want to...Search by Approval Number", here: Access Environment
Access Environment displays the following information:
- business name
- facility address and location on an interactive map
- type of approval or registration from the ministry (view a PDF copy)
- date of issue
- status of the approval (approved, amended, revoked and/or replaced)
- status of the registration (registered, suspended, removed)
Effects of consultation
Comments relevant to the water taking proposal were considered as part of the review of the application. The main concerns raised were regarding the following:
- the volume and duration of water taking requested and its relation to water supply capacity constraints in the Region of Waterloo
- potential impacts of the water taking on nearby private wells, other water users and natural features
- potential effects on groundwater quality from operation of the wash plant
- classification of the application as Category 3 and concerns regarding an implied greater level of risk
- requests for monitoring, reporting and contingency measures, and for public access to monitoring information
The Ministry considered the above comments, including all applicable source water protection policies, during its review of the technical information associated with this water taking.
Through the review process, it was determined that the volume applied for exceeded the requirements of the operation. The daily maximum volume was reduced from 9,720,000 to 5,472,000 litres per day, and the quantity of aggregate on which the supporting water balance is based was lowered from 400,000 to 250,000 tonnes per year.
The Ministry understands that the water supply capacity constraint in the Region of Waterloo stems from limitations in existing municipal water supply infrastructure rather than from any unsustainable pumping of groundwater or absolute shortage of natural water resources. All Permit to Take Water applications undergo a thorough and science-based technical review, and permits are only issued when Ministry technical staff are satisfied that proposed takings are sustainable; will not result in unacceptable impacts to groundwater, surface water or natural features; and will not interfere with other existing water users. Water taking under the issued Permit is not expected to affect any municipal supply wells in the area.
Water taken for aggregate washing at the site is recirculated through settling ponds and returned to the source pond, with only a minimal portion of water being lost to evaporation and entrainment in the aggregate product exported. The Permit also requires a minimum area of cleared land to be maintained at the site in order to maintain infiltration so as to offset any consumptive losses from aggregate washing. The effects of water taking on water levels are not expected to extend beyond the site boundaries; all nearby private wells, municipal supply wells and the Schindelsteddle Wetland Complex lie outside those boundaries. Ministry technical staff have determined that the risk of interference with other water users or natural features is low. A report by a nearby resident of reduced well supply was determined not to be attributable to this taking, as the aggregate washing activities had not commenced at the site. The wash process involves physical washing of the same sand and gravel that make up the aquifer, and no chemical additives are used, so the washing activity does not introduce any contaminants.
Regarding the Category 3 classification, Category 3 applications cover a broad range of risk levels. The Category 3 designation in itself should not be interpreted to indicate that a particular proposal poses an unacceptable risk to the environment, rather it simply indicates that the proposed activity did not meet eligibility requirements for Category 1 or 2 proposals and, as such, requires a supporting technical study to be submitted and reviewed by Ministry staff.
In determining the length of Permit term and the associated conditions, the Ministry assesses a variety of risk factors pertaining to the surrounding environment and other users of a water resource. This assessment includes consideration of the nature of the taking, the hydrogeological setting, and the potential for impacts. The Ministry’s adaptive management approach, and the associated Director authority under the Ontario Water Resources Act, ensure that permits can be reviewed and amended as required at any time, including prior to the Permit’s expiry date. The Permit has been issued for a term of five years, rather than the ten years requested, to allow for a full re-assessment of the water taking following several years of operation.
Monitoring and reporting conditions have been included in the Permit to confirm these conclusions and to make the results publicly available on a website. The conditions of the Permit require that water levels are monitored across the site and within the wetland for the duration of water taking; that baseline water quality is established before any taking begins; and that appropriate and protective trigger levels are in place, with contingency measures that include ceasing water taking. The Permit Holder must also implement a robust complaint response protocol and inform the Ministry of any complaints received.
The Ministry has determined that the potential impacts of this water taking are low, and that the conditions of the Permit are sufficient to ensure that any potential impacts can be detected and addressed through adaptive management, if necessary.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
How to Appeal
This instrument decision can be appealed. You have 15 days from November 10, 2026 to begin the appeal process.
Carefully review the information below to learn more about the appeal process.
How to appealClick to Expand Accordion
Start the process to appeal
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
ESBAUGH SAND & GRAVEL LTD.
1922 Witmer Road
WILMOT,
ON
N0B 2H0
Canada
Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Include the following:
This is not legal advice. Please refer to the Environmental Bill of Rights for exact legal requirements. Consult a lawyer if you need help with the appeal process.
Connect with us
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Original proposal
Proposal details
This proposal is for a new Permit to Take Water for ESBAUGH SAND & GRAVEL LTD. Water will be taken from one pond for aggregate washing purposes. Details of the water taking are as follows:
Permit type –New
Source Name: Hallman Pit
- purpose: aggregate washing-dust suppression
- maximum rate per minute (litres): 13,500
- maximum number of hours of taking per day: 12
- maximum volume per day (litres): 9,720,000
- maximum number of days of taking per year: 230
- earliest calendar date of taking (mm/dd): March 1
- latest calendar date of taking (mm/dd): December 31
- period of taking: 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 3 permit.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Comment
Commenting is now closed.
This consultation was open from February 4, 2026
to March 6, 2026
Connect with us
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Comments received
Through the registry
187By email
1,132By mail
0