ESBAUGH SAND & GRAVEL LTD. - Permit to take water

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Permit to take water

Numéro du REO
026-0124
Numéro de référence du ministère
1000410827
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Décision
Décision publiée
Période de consultation
Du 4 février 2026 au 6 mars 2026 (30 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 4 février 2026
au 6 mars 2026

Résumé de la décision

Permit to Take Water No. P-300-1741082845 was issued to Esbaugh Sand & Gravel Ltd. for the Hallman Pit in the Township of Wilmot. Water will be taken from one pond for aggregate washing and dust suppression purposes.

Détails de l'emplacement

Adresse du site

1922 Witmer Road
WILMOT, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

ESBAUGH SAND & GRAVEL LTD.
1922 Witmer Road
WILMOT, ON
N0B 2H0
Canada

Détails de la décision

Permit to Take Water No. P-300-1741082845 was issued to Esbaugh Sand & Gravel Ltd. for the Hallman Pit in the Township of Wilmot. Water will be taken from one pond for aggregate washing and dust suppression purposes. Details of the water taking are as follows:

Permit type: New

Source name: Wash Pond

Purpose: aggregate washing

  • maximum rate per minute (litres): 7,600
  • maximum number of hours of taking per day: 12
  • maximum volume per day (litres): 5,472,000
  • maximum number of days of taking per year: 230
  • earliest calendar date of taking (mm/dd): March first
  • latest calendar date of taking (mm/dd): December 31
  • period of taking: until October 8, 2031

Purpose: aggregate washing - dust suppression

  • maximum rate per minute (litres): 7,600
  • maximum number of hours of taking per day: 12
  • maximum volume per day (litres): 100,000
  • maximum number of days of taking per year: 230
  • earliest calendar date of taking (mm/dd): March first
  • latest calendar date of taking (mm/dd): December 31
  • period of taking: until October 8, 2031

The permit limits the combined taking for both purposes to 7,600 litres per minute and 5,472,000 litres per day.

Permits to Take Water include conditions that require the permit holder to:

  • collect and record the daily amount of water taken
  • comply with the terms and conditions in the permit
  • immediately report complaints or interference to the ministry
  • report water takings each year to the ministry

Issued Permits To Take Water can be viewed and downloaded at Access Ontario, by searching the approval number, P-300-1741082845, in the search field located at the top of the map, see "I want to...Search by Approval Number", here: Access Environment

Access Environment displays the following information:

  • business name
  • facility address and location on an interactive map
  • type of approval or registration from the ministry (view a PDF copy)
  • date of issue
  • status of the approval (approved, amended, revoked and/or replaced)
  • status of the registration (registered, suspended, removed)

Commentaires reçus

Par l'entremise du registre

187

Par courriel

1 132

Par la poste

0
Consulter les commentaires soumis par l'entremise du registre

Effets de la consultation

Comments relevant to the water taking proposal were considered as part of the review of the application. The main concerns raised were regarding the following:

  • the volume and duration of water taking requested and its relation to water supply capacity constraints in the Region of Waterloo
  • potential impacts of the water taking on nearby private wells, other water users and natural features
  • potential effects on groundwater quality from operation of the wash plant
  • classification of the application as Category 3 and concerns regarding an implied greater level of risk
  • requests for monitoring, reporting and contingency measures, and for public access to monitoring information

The Ministry considered the above comments, including all applicable source water protection policies, during its review of the technical information associated with this water taking.

Through the review process, it was determined that the volume applied for exceeded the requirements of the operation. The daily maximum volume was reduced from 9,720,000 to 5,472,000 litres per day, and the quantity of aggregate on which the supporting water balance is based was lowered from 400,000 to 250,000 tonnes per year.

The Ministry understands that the water supply capacity constraint in the Region of Waterloo stems from limitations in existing municipal water supply infrastructure rather than from any unsustainable pumping of groundwater or absolute shortage of natural water resources. All Permit to Take Water applications undergo a thorough and science-based technical review, and permits are only issued when Ministry technical staff are satisfied that proposed takings are sustainable; will not result in unacceptable impacts to groundwater, surface water or natural features; and will not interfere with other existing water users. Water taking under the issued Permit is not expected to affect any municipal supply wells in the area.

Water taken for aggregate washing at the site is recirculated through settling ponds and returned to the source pond, with only a minimal portion of water being lost to evaporation and entrainment in the aggregate product exported. The Permit also requires a minimum area of cleared land to be maintained at the site in order to maintain infiltration so as to offset any consumptive losses from aggregate washing. The effects of water taking on water levels are not expected to extend beyond the site boundaries; all nearby private wells, municipal supply wells and the Schindelsteddle Wetland Complex lie outside those boundaries. Ministry technical staff have determined that the risk of interference with other water users or natural features is low. A report by a nearby resident of reduced well supply was determined not to be attributable to this taking, as the aggregate washing activities had not commenced at the site. The wash process involves physical washing of the same sand and gravel that make up the aquifer, and no chemical additives are used, so the washing activity does not introduce any contaminants.

Regarding the Category 3 classification, Category 3 applications cover a broad range of risk levels. The Category 3 designation in itself should not be interpreted to indicate that a particular proposal poses an unacceptable risk to the environment, rather it simply indicates that the proposed activity did not meet eligibility requirements for Category 1 or 2 proposals and, as such, requires a supporting technical study to be submitted and reviewed by Ministry staff.

In determining the length of Permit term and the associated conditions, the Ministry assesses a variety of risk factors pertaining to the surrounding environment and other users of a water resource. This assessment includes consideration of the nature of the taking, the hydrogeological setting, and the potential for impacts. The Ministry’s adaptive management approach, and the associated Director authority under the Ontario Water Resources Act, ensure that permits can be reviewed and amended as required at any time, including prior to the Permit’s expiry date. The Permit has been issued for a term of five years, rather than the ten years requested, to allow for a full re-assessment of the water taking following several years of operation.

Monitoring and reporting conditions have been included in the Permit to confirm these conclusions and to make the results publicly available on a website. The conditions of the Permit require that water levels are monitored across the site and within the wetland for the duration of water taking; that baseline water quality is established before any taking begins; and that appropriate and protective trigger levels are in place, with contingency measures that include ceasing water taking. The Permit Holder must also implement a robust complaint response protocol and inform the Ministry of any complaints received.

The Ministry has determined that the potential impacts of this water taking are low, and that the conditions of the Permit are sufficient to ensure that any potential impacts can be detected and addressed through adaptive management, if necessary.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

40 St. Clair Avenue West
Floor 2
Toronto, ON
M4V 1M2
Canada

Office phone number

How to Appeal

Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 10 novembre 2026 pour entamer le processus d’appel.

Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.

Comment interjeter appelClick to Expand Accordion

Start the process to appeal

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Autorité compétente
Neil Taylor
Permit to Take Water Surface Water Specialist

Environmental Permissions Branch
135 St Clair Avenue West
Toronto, ON
M4V 1P5
Canada

416-388-0961

Proponent(s)

ESBAUGH SAND & GRAVEL LTD.
1922 Witmer Road
WILMOT, ON
N0B 2H0
Canada


Organe d’appel

Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Ontario Land Tribunal


Inclure les éléments suivants:

Numéro du REO
026-0124
Numéro de référence du ministère
1000410827

Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.

Communiquer avec nous

Contact

Partager

Courriel

Facebook

X

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
026-0124
Numéro de référence du ministère
1000410827
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Proposition affichée

Période de consultation

4 février 2026 - 6 mars 2026 (30 days)

Détails de la proposition

This proposal is for a new Permit to Take Water for ESBAUGH SAND & GRAVEL LTD. Water will be taken from one pond for aggregate washing purposes. Details of the water taking are as follows:

Permit type –New

Source Name: Hallman Pit

  • purpose: aggregate washing-dust suppression
  • maximum rate per minute (litres): 13,500
  • maximum number of hours of taking per day: 12
  • maximum volume per day (litres): 9,720,000
  • maximum number of days of taking per year: 230
  • earliest calendar date of taking (mm/dd): March 1
  • latest calendar date of taking (mm/dd): December 31
  • period of taking: 10 years

There are 3 categories of a Permit to Take Water:

  • Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
  • Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
  • Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference

The proposed water taking qualifies as a Category 3 permit.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

40 St. Clair Avenue West
Floor 2
Toronto, ON
M4V 1M2
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

Cette consultation a eu lieu 4 février 2026
au 6 mars 2026

Communiquer avec nous

Contact