This proposal is for a new Environmental Compliance Approval for the establishment of stormwater management facilities owned by G. Tackaberry & Sons Construction Company Limited for the collection, transmission, treatment and disposal of stormwater run-off from a site located at 3893 Highway 15, Joyceville, City of Kingston, Ontario.
The minister has approved amendments to Saugeen Valley Assessment Report and Saugeen, Grey Sauble, Northern Bruce Peninsula Source Protection Plan including updates to the Minto Pines and Scott Point drinking water systems to add two municipal drinking water wells as well as minor policy changes for septic system inspections and snow storage.
The Director of Exploration has made a decision on the exploration permit application PR-25-000021 to Voltage Metals Incorporated for early exploration activities.
The decision is to issue the mineral exploration permit.
This proposal is for a new Environmental Compliance Approval (air & noise) for T C CHROME (2005) LTD, a hard chrome plating facility, located at 14 Skagway Avenue, Toronto, Ontario.
A new sewage works Environmental Compliance Approval (ECA) was granted to Ponterio Developments Inc. for stormwater management (SWM) works to serve a total catchment area of 1.26 ha of a proposed Building development at West End Business Park, located at 1351 Kelly Lake Road, City of Greater Sudbury, ON, P3E 5P5.
January 10, 2025 - February 24, 2025 (45 days) Closed
Last updated
A new Environmental Compliance Approval is granted to Parkhill Meats Limited for the collection, transmission, treatment and disposal of process wastewater and storm drainage for the Parkhill Meats Facility located at the Municipality of North Middlesex.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
019-7134
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
May 24, 2023 - July 24, 2023 (61 days) Closed
Last updated
Smiths Construction Company Arnprior Limited has requested to allow extraction below the water table for a licensed pit located in the Township of Horton.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
019-9368
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
November 29, 2024 - December 30, 2024 (31 days) Closed
Last updated
Approval was granted for a site plan amendment to allow Cedarwell Excavating Ltd. to increase the annual tonnage limit for Licence #625799 to 420,000 tonnes, in combination with the adjacent Licence #4996 operating in the Municipality of West Grey.
This proposal is to amend Environmental Compliance Approval (waste disposal site) No. 5010-98JKZE for Danyle Group Inc. The facility is 0.9-hectares in area and is located at 51 Shorncliffe Road, Toronto, Ontario.
January 10, 2025 - February 9, 2025 (30 days) Closed
Last updated
The Director of Exploration has made a decision on the exploration permit application PR-24-000274 to Last Resort Resource Ltd. for early exploration activities.
The decision is to: issue the mineral exploration permit.
This proposal is for a new Environmental Compliance Approval (sewage) for the establishment of sewage works infrastructure, in support of a proposed industrial development, for the collection, transmission, treatment and disposal of stormwater run-off from a site located at 6531 Rutherford Road, in the City of Vaughan, Ontario.
This proposal is for a new Environmental Compliance Approval (sewage) for the establishment of sewage works infrastructure, in support of a proposed industrial development; for the collection, transmission, treatment and disposal of stormwater run-off from a site located at 436 Clair Road West, in the City of Guelph.
This proposal is for an amendment to the existing Environmental Compliance Approval No. A230634 (waste disposal) for Maple Transfer and Recycling Inc. (MTR) for a non-hazardous solid waste transfer and processing facility. The site is a 2.47 hectare property located in the City of Vaughan, Ontario.
This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 9602-A5WQQK for Nucor Steel ULC, a facility that manufacturers low-carbon free-machined cold-finished bar products and wire mesh, located in the City of Burlington, Ontario.
September 6, 2024 - October 21, 2024 (45 days) Closed
Last updated
We issued an Environmental Compliance Approval with Operational Flexibility to MAGNA INTERNATIONAL INC., operating as Deco Automotive, a manufacturer of parts and accessories for the automotive industry located in the City of Toronto, Ontario.
Approval is granted for a Waste Disposal Site (processing) located at 11881 Highway 64 North in Sturgeon Falls, Ontario, for the use and operating a 13.7 hectare site for hydrovac soil processing facility.
January 20, 2025 - February 19, 2025 (30 days) Closed
Last updated
Permit to Take Water No. 5300-DGPREF has been issued to Scrivener Square Nominee Inc. for foundation drainage purposes. Water will be taken from one well located in the City of Toronto, Ontario.
October 21, 2024 - December 5, 2024 (45 days) Closed
Last updated
A new Sewage Works Environmental Compliance Approval (ECA) was granted to Deer Ridge Family Camping & Cottages LTD, a seasonal recreational vehicle park located at 776A Deer Lake Road, in the Municipality of West Nipissing, Ontario., for the collection, treatment and disposal of domestic sewage with a Maximum Daily Flow of 47,640 litres.