The Ministry of Citizenship and Multiculturalism (MCM) has made a decision to pilot an updated version of the draft 2026 Standards and Guidelines for Consultant Archaeologists during the summer of the 2026 archaeology field season. Work on the broader Heritage Framework Transformation initiative continues.
We have decided to permit Oxford County to implement a new combined heat and power system at the existing Woodstock Wastewater Treatment Plant so it can generate electricity and heat using biogas already produced on-site. The project will fit within the current facility footprint, with no changes to operations and new buildings required.
August 11, 2026 - September 25, 2026 (45 days) Closed
Last updated
This proposal is for an amendment to the existing Environmental Compliance Approval No. 4938-5PAGX8 for a replacement of the onsite sewage system servicing the existing and proposed expansion of Hardy Terrace Long-Term Care Facility located at 612 Mount Pleasant, in the City of Brantford, Ontario.
August 11, 2026 - September 25, 2026 (45 days) Closed
Last updated
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) from Great Bear Resources Ltd., a gold mine located approximately 25 kilometres southeast of the Town of Red Lake.
The Director of Exploration has made a decision on the exploration permit application PR-26-000094 to East Timmins Nickel for early exploration activities.
The decision is to: issue the mineral exploration permit.
The Director of Exploration has made a decision on the exploration permit application PR-26-000093 to East Timmins Nickel for early exploration activities.
The decision is to: issue the mineral exploration permit.
August 11, 2026 - September 25, 2026 (45 days) Closed
Last updated
This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 8225-DQZRFP for GP Wood Products North ULC, as general partner for and on behalf of GP North Woods LP, a waferboard manufacturing facility located in the Town of Englehart, Ontario.
February 26, 2026 - April 12, 2026 (45 days) Closed
Last updated
The director has amended Environmental Compliance Approval (air & noise) No. 6254-9LVQ3V for Imperial Oil Limited, a refining and petrochemical manufacturing facility located in the City of Sarnia, Ontario.
November 13, 2025 - December 28, 2025 (45 days) Closed
Last updated
An Environmental Compliance Approval with Limited Operational Flexibility (air & noise) has been granted to Kromet International Inc., a manufacturer of aluminum parts, including aluminum extrusion, cutting and grinding, located in the City of Cambridge, Ontario.
The application was cancelled by the Ministry because there was insufficient information in the application. An Environmental Compliance Approval was not issued.
August 18, 2023 - October 2, 2023 (45 days) Closed
Last updated
The application was cancelled by the Ministry because there was insufficient information in the application. An Environmental Compliance Approval was not issued.
August 10, 2026 - September 24, 2026 (45 days) Closed
Last updated
This proposal is for an amendment to Environmental Compliance Approval (air & noise) No. 5917-BUTV5Q for Clean Harbors Canada, Inc., for the operation of a mobile treatment system, operating throughout the Province of Ontario.
This proposal is to amend the Environmental Compliance Approval (air & noise) No. 2542-APGUC5 for Pastway Planing Ltd. for the operation of a lumber dimensioning and treatment facility, located in the Combermere, Ontario.
This proposal is for a new Environmental Compliance Approval (industrial sewage) for Walker Aggregates Inc.. This application is for the collection, transmission, treatment and disposal of washwater from an aggregate washing plant and stormwater run-off.
This proposal is for a new Environmental Compliance Approval for the establishment of stormwater management facilities owned by G. Tackaberry & Sons Construction Company Limited for the collection, transmission, treatment and disposal of stormwater run-off from a site located at 3893 Highway 15, Joyceville, City of Kingston, Ontario.
August 7, 2026 - September 21, 2026 (45 days) Closed
Last updated
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) from Aevitas Inc., a waste processing facility, located in Ayr, Township of North Dumfries, Ontario.
The Director of Exploration has made a decision on the exploration permit application PR-26-000076 to Storm Exploration Inc. for early exploration activities.
The decision is to: issue the mineral exploration permit.
August 7, 2026 - September 21, 2026 (45 days) Closed
Last updated
This proposal is for an amendment to the existing Environmental Compliance Approval No. 4-099-69-947 to remove surface water discharge to the Big East River, update the monitoring requirements, and update the description of work to more accurately reflect current operations at the 570 Ravenscliff Road site, in the Town of Huntsville, Ontario.
August 7, 2026 - September 21, 2026 (45 days) Closed
Last updated
This proposal is for a new Environmental Compliance Approval (air & noise) for Tempel Canada Company, a manufacturer of transformer cores at a facility located at 4741 Palladium Way, Burlington, Ontario.