September 1, 2026 - October 16, 2026 (45 days) Open
Last updated
This proposal is for an amendment to the Limited Operational Flexibility for the Environmental Compliance Approval (air & noise) No. 9861-A8AK4Z for Walker Aggregates Inc., an aggregate extraction and processing facility located in the Township of Clearview, Ontario.
The Ministry is proposing to approve a request for a conditional filing order to Grace Gold Limited (“the Proponent”) to allow the submission of a closure plan amendment for the Clavos Mine Project, that does not meet all statutory requirements at the time of submission.
Permit to Take Water No. P-300-9413814989 was issued to COVIA CANADA LTD./COVIA CANADA LTEE to renew PTTW No. 0112-CT7MDY for industrial and dust suppression purposes. Water will be taken from two intakes of Big Mountain Lake for five years, located in the Geographic Township of Methuen Havelock- Belmont-Methuen, Ontario.
Permit to Take Water No. P-300-3428806385 was issued to Derrydale Golf Course Limited to renew Permit to Take Water No. 7370-A8YL4P for golf irrigation purposes. Water will be taken from one pond located in the Town of Erin, Ontario for 10 years.
Approval for the establishment of industrial stormwater management Works to serve the Power Road Waste Disposal Site with approval # A460716 to conform to condition 53; for the collection, transmission, treatment and disposal of stormwater run-off from the non-process area located within a total catchment area of 2.27 hectares.
An amended Environmental Compliance Approval with Limited Operational Flexibility (air & noise) has been issued to Magris Talc Canada Inc., an open pit talc mining and concentrating facility located in the Unorganized Township of Reeves and Unorganized Township of Penhorwood, Ontario.
A new Environmental Compliance Approval (sewage) was issued for the establishment of a sewage treatment plant and subsurface disposal works to service a residential RV Park of 117 RV sites and a three bedroom residence located at 5216 County Road 90 in Springwater, Ontario.
Application was cancelled for use of a Holding Tank to service concrete wash water generated from manufacturing of precast concretes products. The ministry determined that the proposed sewage works do not fall under the Ontario Water Resources Act (OWRA) section 53 ECA requirements; rather it meets the OWRA section 53 (6)(a) exemption.
Cancelled application due to incomplete submission. The submitted application was for Stormwater Management for a site of more than 30 ha. Later, it was found that the application should be for industrial wastewater treatment and a report on solids settlement shall be provided. But it was not provided by the consultant within the stipulated time
A new Environmental Compliance Approval is granted for site wide existing and proposed sewage Works to serve the Bramhall Community year round trailer park, located at 5263 Elliott Sideroad, Tay Township, County of Simcoe, L4R 4K3
Instrument type:
Approval of a municipality’s official plan
ERO number
026-0848
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
August 31, 2026 - September 30, 2026 (30 days) Open
Last updated
The Ministry of Municipal Affairs and Housing has received a new official plan from the Municipality of West Nipissing for a decision. The purpose is to achieve consistency with provincial policies and to establish goals, policies, objectives, and local policies to manage and direct physical (land use) change within the Municipality.
Instrument type:
Approval of a municipality’s official plan
ERO number
026-0863
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
August 31, 2026 - September 30, 2026 (30 days) Open
Last updated
The Ministry of Municipal Affairs and Housing has received a new official plan from the Township of Seguin for a decision. The purpose of the proposed plan is to achieve consistency with provincial policies, and to establish goals, objectives, and local policies to manage and direct physical (land use) change within the Township.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
019-9055
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
August 16, 2024 - September 16, 2024 (31 days) Closed
Last updated
James Thoume Construction Ltd. seeks to authorize importation of excess soil and add cropping sequence and revise the rehabilitation plan for the contouring to the northwest portion of the site to an elevation of 378 masl.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
019-9029
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
August 12, 2024 - September 11, 2024 (30 days) Closed
Last updated
Lafarge Canada Inc., seeks to authorize a site plan amendment to import 1.7 million cubic metres of excess soil to return the site to the original grade.
We amended Renewable Energy Approval No. 3507-9ABJWH for the Goulais Wind Farm located in the unorganized township of Pennefather, District of Algoma. This amendment is to allow the increase of the nameplate capacity of eleven (11) turbines from 2.3 megawatts (MW) to 2.5 MW. The project’s overall nameplate capacity of 25 MW will remain the same.