An amendment to Environmental Compliance Approval (air) No. 1949-9LZHA7 with operational flexibility was issued to Canadian Electrocoating Ltd. and Prince Metal Products Ltd., a metal stamping, electrocoating of metal stampings, and assembly of metal products manufacturing facility, located in the City of Windsor, Ontario.
January 10, 2017 - March 13, 2017 (62 days) Closed
Last updated
We are proposing changes to Black Sturgeon River Provincial Park’s management plan. The changes aim to protect and restore the walleye population in response to threats from invasive species.
We are developing a plan to protect MacLeod Provincial Park's natural and cultural heritage. The plan will guide the use, development, management and operation of the park for a 20-year period.
An amended Environmental Compliance Approval (air & noise) was issued to SCAPA TAPES NORTH AMERICA ULC (previously known as Scapa Tapes North America Limited) a manufacturer of adhesive tapes at a facility located at 609 Barnet Boulevard, Renfrew, Ontario.
The proposal is for a new Environmental Compliance Approval for industrial stormwater management works serving Ontario Power Generation Inc., located at 333 Stinson Hydro Road, in Sudbury, Ontario.
This notice invited comments on the Southwestern Ontario Transportation Planning Study, which delivers on a commitment in Connecting the Southwest: a draft transportation plan for southwestern Ontario and is intended to support government decision-making to improve the transportation network. The feedback received has informed updates to the study
This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 0188-A3RQKS for C.A.I. Inks Canada Ltd., a manufacture of liquid inks and general industrial office activities facility, located in Prescott, Ontario.
The proposal is for a new Environmental Compliance Approval for industrial stormwater management works serving CHAR Tech Thorold GP Inc. as general partner for and on behalf of CHAR Bioveld Thorold LP, located at 3363 Davis Road, in the City of Thorold, Ontario.
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) for Crate 61 Organics Inc., a bar soap manufacturing facility, located in the City of Pickering, Ontario.
This proposal is to amend the Environmental Compliance Approval (air & noise) No. 4152-96GGTN for Wabi Iron & Steel Corp., operating a foundry providing various wear and heat resistant properties for a wide range of industrial clients and applications located in New Liskeard, Ontario.
October 22, 2025 - December 6, 2025 (45 days) Closed
Last updated
We have updated the Director’s Directions: Minimum Requirements for Operational Plans for municipal residential drinking water systems. This update provides flexibility to organizations operating multiple connected municipal residential drinking water systems while maintaining environmental protection.
We have issued an Environmental Compliance Approval with Limited Operational Flexibility to Heico 2004 Member, Inc. as the general partner for and on behalf of Ivaco Rolling Mills 2004 L.P., a electric arc furnace steelmaking facility located in L'Orignal, Ontario.
October 4, 2024 - November 18, 2024 (45 days) Closed
Last updated
Approval is granted to amend the existing site waste approval to allow maximum incoming rate of waste to 3,000 tonnes per day, based on annual average.
July 24, 2025 - September 7, 2025 (45 days) Closed
Last updated
This decision is for a new Environmental Compliance Approval for the establishment of seasonal subsurface sewage disposal works rated at 30,000 litres per day, to service Camp Howland youth camp located at 5373 Haliburton County Road 121, in the Township of Minden Hills, Ontario.
This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 4649-9PPJLK for Lincoln Electric Company of Canada GP 2 Limited as general partner for and on behalf of Lincoln Electric Company of Canada LP, an aluminum wire production facility, located in Mississauga, Ontario.
This proposal is for a new Environmental Compliance Approval (air & noise) for Clarke Construction Inc. for the operation of a mobile crushing plant, equipped with a crusher, a screener, a stacker and associated diesel engines.