This proposal is for an amendment to Environmental Compliance Approval No. 8580-5RWN6S (sewage) for The Cottages at Port Stanton Inc. located in Township of Severn, County of Simcoe.
This proposal is for a new Environmental Compliance Approval (air) for Macron Industries Corp. operating as Canal Block, a concrete block manufacturing facility, located in Port Colborne, Ontario.
December 16, 2024 - January 30, 2025 (45 days) Closed
Last updated
An Environmental Compliance Approval (air and noise) was issued for Environmental Services Inc., a waste transfer and processing facility located in the Municipality of Chatham-Kent, Ontario.
We have issued a new Environmental Compliance Approval to Cole's Metal Fabricating Ltd. for its metal fabrication facility located at 1195 Westcott Road, Windsor.
October 31, 2025 - November 30, 2025 (30 days) Closed
Last updated
Permit to Take Water No. 0378-DQQRR6 has been issued to St. Albert Cheese Co-operative Inc., for industrial food processing for a cheese production plant. Water will be taken from four wells in The Municipality of The Nation, Ontario.
November 14, 2025 - December 29, 2025 (45 days) Closed
Last updated
We issued this new Environmental Compliance Approval for the construction of domestic sewage disposal works, with a maximum design daily flow of 59,000 litres per day to service a four-unit building (mixed warehouse and office use) located at 1650 Halls Road North in the Town of Whitby, Ontario.
August 22, 2024 - October 6, 2024 (45 days) Closed
Last updated
This decision is for a new Environmental Compliance Approval for industrial sewage works for vegetable wash water serving Greenway Advance Produce (Pedro Rodrigues) located at 2203 Canal Road, in Bradford West Gwillimbury.
We issued an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) to Marwood International Inc., an automotive component manufacturing and electrocoating facility, located in the Town of Ingersoll, Ontario.
January 5, 2026 - February 4, 2026 (30 days) Closed
Last updated
The Director of Exploration has made a decision on the exploration permit application PR-25-000274 to 10148942 Manitoba Limited for early exploration activities. The decision is to issue the mineral exploration permit.
We are proposing updates to the Procedures for the Use of Risk Assessment under Part XV.1 of the Environmental Protection Act document to align it with latest regulatory requirements and best practices related to brownfields risk assessment. We are seeking feedback on the document so we can improve its overall quality and usefulness.
We are proposing updates to the Technical Guidance for Soil Vapour Intrusion Assessment, which builds on a draft document previously posted for public consultation in September 2013 (011-2912). Before finalizing this document, we are once again seeking comments to ensure that the updated guidance reflects the need of stakeholders.
July 19, 2024 - September 2, 2024 (45 days) Closed
Last updated
A new Environmental Compliance Approval has been issued for the establishment of subsurface sewage disposal works rated at 18,800 litres per day, to service a seasonal trailer park located at 9 Glenford Lane, in South Frontenac.
January 7, 2026 - February 21, 2026 (45 days) Closed
Last updated
A new Environmental Compliance Approval (sewage) has been issued for the upgrading of existing wastewater disposal for Camp Barcovan Trailer Park located at 133 Carter Road, Quinte West, Ontario.
The Ministry of Transportation is proposing a one year Northern Rideshare Pilot along the Northlander Passenger Train corridor between Gravenhurst and Cochrane. The pilot would establish minimum requirements for rideshare operators, drivers and vehicles operating in communities along the corridor.
December 20, 2024 - February 3, 2025 (45 days) Closed
Last updated
A decision was made to approve a site-specific amendment to remove certain lands in the Town of Oakville from the Parkway Belt West Plan (PBWP) and the associated Minister's Zoning Order (MZO), filed as Ontario Regulation 481/73.
The PBWP amendment is approved as amendment No. 247 and the MZO amendment is filed as Ontario Regulation 48/26.
Instrument type:
Approval to amend a municipality’s official plan
ERO number
025-0194
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
June 4, 2025 - July 4, 2025 (30 days) Closed
Last updated
A decision was made on March 19, 2026 to approve the City of Cambridge Official Plan Amendment 49, as adopted by By- law 21-076. Official Plan Amendment 49 proposes to add a site-specific policy to permit both residential and commercial uses at grade for the lands municipally known as 55 Kerr Street.